Client needed cabinets in a short period of time and my company was able to get them their cabinets in less than 3 weeks. After installing the cabinets Iwas asked if i could get them countertops for the entire project because the original contractor who was supposed to be providing countertops was going to be 3 weeks later than what was scheduled. After recieving the contract i was able to buy , fabricate and install 455 sq ft of granite in two weeks total, helping the contractor stay ahead of schedule